  1.  
  2.  
  3.  
  4.                                            TRF
  5.                                Mechanical Estimating System
  6.                                       Sample Reports
  7.  
  8.  
  9. The TRF Mechanical Estimating System is the most powerful, flexible, and 
  10. user friendly estimating system available in todays market. The system can
  11. provide reports in various formats enabling the user to access a large amount 
  12. of information quickly & precisely. Some unique features available with 
  13. the system are:
  14.  
  15.         1. The Bid can be extended in many different formats. One of the
  16.            most useful reports prints out the extensions at the assembly 
  17.            level instead of at the parts level as is required by other 
  18.            systems.
  19.         
  20.         2. The report can print out each assembly as an extended Part or
  21.            as a unit price. Very frequently you are asked to provide unit
  22.            prices as part of a bid, now you can do it as one easy step.
  23.         
  24.         3. You can select to print out all your reports to disk rather 
  25.            than your printer. This will enable you to retrieve them from 
  26.            a word processor and format them for printing on your letter 
  27.            head.
  28.         
  29.         4. The reports can be printed with the takeoff grouped by System, 
  30.            Job Cost Code, and Product Code in the same bid summary.
  31.         
  32.         5. The bid can be extended using either the Standard Labor & 
  33.            Material Units, normally called Change Order Units or
  34.            by Bid Labor & Material Units.
  35.         
  36.         6. The system enables you to create Take-Off Entry Worksheets 
  37.            that can be used for take off and then handed to clerical,
  38.            personnel for input to the computer.
  39.         
  40.         7. You can print out various Bid Summary reports including Bid
  41.            Analysis and Square Footage Reports, enabling a quick analysis 
  42.            of a particular job.
  43.         
  44.         8. After completing a takeoff you can print a consolidated 
  45.            material quote sheet that will allow you to get a better 
  46.            price from your supplier.
  47. 
  48.  
  49.                                    
  50.  
  51.                                   Index
  52.                      Report Samples Contained on Disk
  53.  
  54.         1.      Unit Price Extension
  55.  
  56.  
  57.         2.      Total Price extension
  58.  
  59.  
  60.         3.      Parts Extension Sorted By System
  61.  
  62.  
  63.         4.      Parts Extension Sorted By Job Cost Code
  64.  
  65.  
  66.         5       Parts Extension Sorted By Commodity Code
  67.  
  68.  
  69.         6.      Recap Sheet - Brief Takeoff Recap
  70.  
  71.  
  72.         7.      Recap By System with Square Foot Analysis
  73.  
  74.  
  75.         8.      Job Recap By Cost Code
  76.  
  77.  
  78.         9.      Bid Summary Analysis
  79.  
  80.  
  81.         10.     Vendor Quote Sheet
  82.  
  83.  
  84.         11.     Warehouse Material Pull List
  85.  
  86.  
  87.         12.     Consolidated Material List
  88.  
  89.  
  90.         13.     Project Specification
  91.  
  92.  
  93.         14.     Sample Proposal Letter
  94.  
  95.  
  96.                               TRF International, Inc.
  97. JOB:   15-ED       *   B I D   T A K E - O F F   D E T A I L S   *      02-03-91  0:49 Pg: 1
  98.  
  99. Test Job              BID DATE                     MATERIAL  LABOR  MATERIAL  LABOR    LABOR
  100. Wilson Const          01-29-91                        TAX     TAX      M/U     M/U      RATE
  101.                                                     6.000%   EXEMPT   1.20    1.20    $30.00
  102.  
  103.         1=DIFFICULTY FACTOR                             LABOR   LABOR  MATERIAL  UNIT    UNIT
  104.   ASSM SYS LOC  D E S C R I P T I O N           COUNT    UNIT    COST    COST     COST   PRICE
  105. ==============================================================================================
  106.      1   1  1   Underground Sanitary
  107.   3007   1  1   4"X5' PIPE CI SH P/FT             60    .230    6.90     3.85   10.75   12.90
  108.                  4" 1/4 Bend Hub                   3    .830   24.90     7.31   32.21   38.65
  109.                  4" 1/4 Bend Long Swp Hub          1    .890   26.70    11.26   37.96   45.55
  110.                  6"x4" Y & 1/8 Bnd Hub             1   2.000   60.00    22.63   82.63   99.16
  111.                  4"x4" Y & 1/8 Bnd Hub             1   1.580   47.40    13.74   61.14   73.37
  112.                  Exc 2'x3' trench <=5" pipe       60    .200    6.00             6.00    7.20
  113.                                                 ----   -----  ------  ------- -------- ------
  114.   ***** 1    System Totals:                            32.76     983      300   1,283   1,540
  115. ==============================================================================================
  116.      2   2  2   Above Ground Sanitary
  117.   4008   2  2   4"X10' PIPE CI NH P/FT            10    .200    6.00     2.93    8.93   10.72
  118.                  4" Bend 1/4 Reg NH                1    .750   22.50     4.62   27.12   32.55
  119.                  4x4x10x16" Closet Bend PE NH      1    .750   22.50    17.89   40.39   48.47
  120.   4107   2  2   3" CI NH 10ft w/HNGR              10    .261    7.83     2.77   10.60   12.72
  121.                  3"x2" Comb. Dbl Y & 1/8 NH        1    .920   27.60     8.85   36.45   43.74
  122.                                                 ----   -----  ------  -------  ------ -------
  123.   ***** 2    System Totals:                             7.03     211       88     299     359
  124. ==============================================================================================
  125.      3   3  3   Domestic Cold Water
  126.  20801   3  3   3/4" Cop L w/Hngr & Shld          75    .288    8.65     1.49   10.13   12.16
  127.                  3/4" Cop 90 Ell CxC               4    .540   16.20      .41   16.61   19.94
  128.                  3/4" Tee CxCxC                    1    .770   23.10      .77   23.87   28.64
  129.                  1/2x6" Air Chamber                1    .410   12.30     1.21   13.51   16.21
  130.                  3/4" Copper Union CxC             1    .540   16.20     1.75   17.95   21.54
  131.                                                 ----   -----  ------  -------  ------- ------
  132.   ***** 3    System Totals:                            25.50     765      117     882   1,058
  133. ==============================================================================================
  134. 
  135.                                   TRF International, Inc.
  136.   JOB:   15-ED       *   B I D   T A K E  - O F F   D E T A I L S   *     02-05-91 14:05 Pg: 1
  137.  
  138.   Test Job              BID DATE                     MATERIAL  LABOR  MATERIAL  LABOR   LABOR
  139.   Wilson Const          01-29-91                        TAX     TAX    M/U      M/U     RATE
  140.                                                      6.000%   EXEMPT   1.20     1.20    $30.00
  141.  
  142.        1=DIFFICULTY FACTOR                               LABOR   LABOR  MATERIAL  UNIT  EXTEND 
  143.   ASSM SYS LOC  D E S C R I P T I O N          COUNT     UNIT    COST   COST      COST  PRICE
  144. ==============================================================================================
  145.      1   1  1   Underground Sanitary
  146.   3007   1  1   4"X5' PIPE CI SH P/FT             60
  147.                  4"x5' Pipe CI SH P/ft            60    .230    6.90     3.85   10.75  773.80
  148.                  4" 1/4 Bend Hub                   3    .830   24.90     7.31   32.21  115.94
  149.                  4" 1/4 Bend Long Swp Hub          1    .890   26.70    11.26   37.96   45.55
  150.                  6"x4" Y & 1/8 Bnd Hub             1   2.000   60.00    22.63   82.63   99.16
  151.                  4"x4" Y & 1/8 Bnd Hub             1   1.580   47.40    13.74   61.14   73.37
  152.                  Exc 2'x3' trench <=5" pipe       60    .200    6.00             6.00  432.00
  153.                                                 ----   -----  ------  ------- ------- -------
  154.   ***** 1    System Totals:                            32.76     983      300   1,283   1,540
  155. ==============================================================================================
  156.      2   2  2   Above Ground Sanitary 
  157.   4008   2  2   4"X10' PIPE CI NH P/FT            10 
  158.                  4"x10' Pipe CI NH P/ft           10    .200    6.00     2.93    8.93  107.19
  159.                  4" Bend 1/4 Reg NH                1    .750   22.50     4.62   27.12   32.55
  160.                  4x4x10x16" Closet Bend PE NH      1    .750   22.50    17.89   40.39   48.47
  161.   4107   2  2   3" CI NH 10ft w/HNGR              10 
  162.                  3"x10' Pipe CI NH P/ft           10    .150    4.50     2.27    6.77   81.21
  163.                  3" Coupling NH                    1                     1.76    1.76    2.12
  164.                  3" Hngr Clevis Blk                1   1.110   33.30     1.13   34.43   41.32
  165.                  10-1/2-PL REG HEX NUT             3                      .06     .06     .21
  166.                  11-1/2 ROUND FLAT WASHERS         3                      .04     .04     .16
  167.                  355-PL STEEL CONCRETE INSERT      1                      .66     .66     .79
  168.                  50-1/2-PL ALL THRD ROD P/FT       3                      .40     .40    1.44
  169.                  3"x2" Comb. Dbl Y & 1/8 NH        1    .920   27.60     8.85   36.45   43.74
  170.                                                 ----   -----  ------  ------- ------- -------
  171.   ***** 2    System Totals:                             7.03     211       88     299     359
  172. ==============================================================================================
  173.       3   3  3   Domestic Cold Water
  174.   20801   3  3   3/4" Cop L w/Hngr & Shld          75
  175.                   3/4" Pipe Cop L Hard             75    .060    1.80      .81    2.61  234.66
  176.                   4" Dia Ins Shld 12"x18ga         10    .230    6.90     1.85    8.75  110.30
  177.                   4" Hngr Clevis Blk               10   1.400   42.00     1.39   43.39  546.66
  178.                   10-3/8-PL REG HEX NUT            32                      .03     .03    1.21
  179.                   11-3/8 ROUND FLAT WASHERS        32                      .03     .03    1.22
  180.                   355-PL STEEL CONCRETE INSERT     10                      .66     .66    8.32
  181.                   50-3/8-PL ALL THRD ROD P/FT      32                      .25     .25    9.76
  182.                   3/4" Cop 90 Ell CxC               4    .540   16.20      .41   16.61   79.74
  183.                   3/4" Tee CxCxC                    1    .770   23.10      .77   23.87   28.64
  184.                   1/2x6" Air Chamber                1    .410   12.30     1.21   13.51   16.21
  185.                   3/4" Copper Union CxC             1    .540   16.20     1.75   17.95   21.54
  186.                                                  ----   -----  ------  ------- ------- -------
  187.   ***** 3    System Totals:                             25.50     765      117     882   1,058
  188. ==============================================================================================
  189. 
  190.                                 TRF International, Inc.
  191.   JOB:   15-ED       *   B I D   T A K E - O F F   D E T A I L S   *      02-03-91  0:49 Pg: 1 
  192.  
  193.   Test Job              BID DATE                     MATERIAL  LABOR  MATERIAL  LABOR    LABOR
  194.   Wilson Const          01-29-91                        TAX     TAX      M/U     M/U      RATE
  195.                                                       6.000%   EXEMPT  1.20    1.20     $30.00
  196.  
  197.             1=DIFFICULTY FACTOR                         LABOR  LABOR  MATERIAL   UNIT    UNIT
  198.   ASSM SYS LOC  D E S C R I P T I O N           COUNT   UNIT   COST   COST       COST    PRICE
  199. ==============================================================================================
  200.       1   1  1   Underground Sanitary
  201.    3007   1  1   4"X5' PIPE CI SH P/FT             60
  202.                   4"x5' Pipe CI SH P/ft            60    .230    6.90     3.85   10.75   12.90
  203.                   4" 1/4 Bend Hub                   3    .830   24.90     7.31   32.21   38.65
  204.                   4" 1/4 Bend Long Swp Hub          1    .890   26.70    11.26   37.96   45.55
  205.                   6"x4" Y & 1/8 Bnd Hub             1   2.000   60.00    22.63   82.63   99.16
  206.                   4"x4" Y & 1/8 Bnd Hub             1   1.580   47.40    13.74   61.14   73.37
  207.                   Exc 2'x3' trench <=5" pipe       60    .200    6.00             6.00    7.20
  208.                                                  ----   -----  ------  ------- -------  ------
  209.   ***** 1        System Totals:                         32.76     983      300   1,283   1,540
  210. ==============================================================================================
  211.       2   2  2   Above Ground Sanitary                                        
  212.    4008   2  2   4"X10' PIPE CI NH P/FT            10
  213.                   4"x10' Pipe CI NH P/ft           10    .200    6.00     2.93    8.93   10.72
  214.                   4" Bend 1/4 Reg NH                1    .750   22.50     4.62   27.12   32.55
  215.                   4x4x10x16" Closet Bend PE NH      1    .750   22.50    17.89   40.39   48.47
  216.    4107   2  2   3" CI NH 10ft w/HNGR              10                              
  217.                   3"x10' Pipe CI NH P/ft           10    .150    4.50     2.27    6.77    8.12
  218.                   3" Coupling NH                    1                     1.76    1.76    2.12
  219.                   3" Hngr Clevis Blk                1   1.110   33.30     1.13   34.43   41.32
  220.                   10-1/2-PL REG HEX NUT             3                      .06     .06     .07
  221.                   11-1/2 ROUND FLAT WASHERS         3                      .04     .04     .05
  222.                   355-PL STEEL CONCRETE INSERT      1                      .66     .66     .79
  223.                   50-1/2-PL ALL THRD ROD P/FT       3                      .40     .40     .48
  224.                   3"x2" Comb. Dbl Y & 1/8 NH        1    .920   27.60     8.85   36.45   43.74
  225.                                                  ----   -----  ------  ------- -------  ------
  226.   ***** 2    System Totals:                              7.03     211       88     299     359
  227. ==============================================================================================
  228.       3   3  3   Domestic Cold Water
  229.   20801   3  3   3/4" Cop L w/Hngr & Shld          75
  230.                   3/4" Pipe Cop L Hard             75    .060    1.80      .81    2.61    3.13
  231.                   4" Dia Ins Shld 12"x18ga         10    .230    6.90     1.85    8.75   10.50
  232.                   4" Hngr Clevis Blk               10   1.400   42.00     1.39   43.39   52.06
  233.                   10-3/8-PL REG HEX NUT            32                      .03     .03     .04
  234.                   11-3/8 ROUND FLAT WASHERS        32                      .03     .03     .04
  235.                   355-PL STEEL CONCRETE INSERT     10                      .66     .66     .79
  236.                   50-3/8-PL ALL THRD ROD P/FT      32                      .25     .25     .30
  237.                   3/4" Cop 90 Ell CxC               4    .540   16.20      .41   16.61   19.94
  238.                   3/4" Tee CxCxC                    1    .770   23.10      .77   23.87   28.64
  239.                   1/2x6" Air Chamber                1    .410   12.30     1.21   13.51   16.21
  240.                   3/4" Copper Union CxC             1    .540   16.20     1.75   17.95   21.54
  241.                                                  ----   -----  ------  ------- -------  ------
  242.   ***** 3    System Totals:                             25.50     765      117     882   1,058
  243.  
  244.   
  245.                               TRF International, Inc.
  246.   JOB:   15-ED       *   B I D   T A K E - O F F   D E T A I L S   *    02-01-91   11:18 Pg: 1
  247.  
  248.   Test Job              BID DATE                     MATERIAL  LABOR  MATERIAL  LABOR   LABOR
  249.   Wilson Const          01-29-91                        TAX     TAX      M/U     M/U     RATE
  250.                                                       6.000%   EXEMPT   1.20    1.20    $30.00
  251.            1=DIFFICULTY FACTOR                          --- LABOR ---       ---- MATERIAL ----
  252.   ASSM SYS LOC  D E S C R I P T I O N           COUNT    UNIT   HOURS       UNIT        EXTEND
  253. ==============================================================================================
  254.                  4"x5' Pipe CI SH P/ft             60    .230   13.80       3.847       230.82
  255.                  4" 1/4 Bend Hub                    3    .830    2.49       7.306        21.92
  256.                  4" 1/4 Bend Long Swp Hub           1    .890     .89      11.256        11.25
  257.                  4"x4" Y & 1/8 Bnd Hub              1   1.580    1.58      13.743        13.74
  258.                  6"x4" Y & 1/8 Bnd Hub              1   2.000    2.00      22.629        22.62
  259.                  Exc 2'x3' trench <=5" pipe        60    .200   12.00                        
  260.                                                                ------                 --------
  261.   *****   1      System Totals:                                 32.76                   300.37
  262. ==============================================================================================
  263.                  3"x10' Pipe CI NH P/ft            10    .150    1.50       2.267        22.67
  264.                  4"x10' Pipe CI NH P/ft            10    .200    2.00       2.932        29.32
  265.                  4x4x10x16" Closet Bend PE NH       1    .750     .75      17.890        17.89
  266.                  4" Bend 1/4 Reg NH                 1    .750     .75       4.622         4.62
  267.                  3"x2" Comb. Dbl Y & 1/8 NH         1    .920     .92       8.849         8.84
  268.                  3" Coupling NH                     1                       1.762         1.76
  269.                  3" Hngr Clevis Blk                 1   1.110    1.11       1.130         1.13
  270.                  10-1/2-PL REG HEX NUT              3                        .057          .17
  271.                  11-1/2 ROUND FLAT WASHERS          3                        .043          .12
  272.                  355-PL STEEL CONCRETE INSERT       1                        .660          .66
  273.                  50-1/2-PL ALL THRD ROD P/FT        3                        .400         1.20
  274.                                                                ------                 -------
  275.   *****    2    System Totals:                                   7.03                    88.42
  276. ==============================================================================================
  277.                  3/4" Pipe Cop L Hard              75    .060    4.50        .807        60.54
  278.                  3/4" Copper Union CxC              1    .540     .54       1.749         1.74
  279.                  3/4" Cop 90 Ell CxC                4    .540    2.16        .413         1.65
  280.                  3/4" Tee CxCxC                     1    .770     .77        .769          .76
  281.                  1/2x6" Air Chamber                 1    .410     .41       1.208         1.20
  282.                  4" Dia Ins Shld 12"x18ga          10    .230    2.41       1.853        19.46
  283.                  4" Hngr Clevis Blk                10   1.400   14.70       1.385        14.54
  284.                  10-3/8-PL REG HEX NUT             32                        .031         1.00
  285.                  11-3/8 ROUND FLAT WASHERS         32                        .031         1.01
  286.                  355-PL STEEL CONCRETE INSERT      10                        .660         6.93
  287.                  50-3/8-PL ALL THRD ROD P/FT       32                        .252         8.13
  288.                                                                ------                  -------
  289.   *****    3    System Totals:                                  25.49                   117.03
  290.  
  291. 
  292.                                      TRF International, Inc. 
  293.  JOB:   15-ED           *   TAKE-OFF PARTS SUMMARIZED BY COST CODE   *    02-01-91 11:18 Pg:1
  294.  
  295.   Test Job          BID DATE                     MATERIAL    LABOR   MATERIAL   LABOR   LABOR
  296.   Wilson Const      01-29-91                      TAX        TAX       M/U      M/U     RATE
  297.                                                  6.000%     EXEMPT    1.20     1.20    $30.00 
  298.  
  299.   1=DIFFICULTY FACTOR                                  ------ LABOR ------   --- MATERIAL----
  300.   PART NUMBER   D E S C R I P T I O N       COUNT    UNIT   HOURS  % TTL      UNIT    EXTEND 
  301. ==============================================================================================
  302.   Account Code:  330 - Copper Type L P&F                                     
  303.  
  304.    462PCER0144   3/4" Pipe Cop L Hard          75    .060    4.50    6.9      .807     60.54
  305.    543PNIB0070   3/4" Copper Union CxC          1    .540     .54     .8     1.749      1.74
  306.    544PNIB0785   3/4" Cop 90 Ell CxC            4    .540    2.16    3.3      .413      1.65
  307.    544PNIB0885   3/4" Tee CxCxC                 1    .770     .77    1.2      .769       .76
  308.    544PNIB1705   1/2x6" Air Chamber             1    .410     .41     .6     1.208      1.20
  309.                                                            ------  -----             -------
  310.    Subtotal: Copper Type L P&F                              8.38   12.8%              65.92
  311. ==============================================================================================
  312.   Account Code:  352 - CI Hub P&F 
  313.  
  314.   413PTYP0119   4"x5' Pipe CI SH P/ft             60    .230   13.80   21.1    3.847   230.82
  315.   503PTYP0149   4" 1/4 Bend Hub                    3    .830    2.49    3.8    7.306    21.92
  316.   503PTYP0210   4" 1/4 Bend Long Swp Hub           1    .890     .89    1.4   11.256    11.25
  317.   503PTYP0415   4"x4" Y & 1/8 Bnd Hub              1   1.580    1.58    2.4   13.743    13.74
  318.   503PTYP0445   6"x4" Y & 1/8 Bnd Hub              1   2.000    2.00    3.1   22.629    22.62
  319.                                                               ------  -----  -------  -------
  320.       Subtotal: CI Hub P&F                                     20.76   31.8%           300.37
  321. ==============================================================================================
  322.   Account Code:  354 - CI No Hub P&F 
  323.  
  324.   415PTYP0029   3"x10' Pipe CI NH P/ft            10    .150    1.50    2.3    2.267    22.67
  325.   415PTYP0039   4"x10' Pipe CI NH P/ft            10    .200    2.00    3.1    2.932    29.32
  326.   505PTYP0020   4x4x10x16" Closet Bend PE NH       1    .750     .75    1.1   17.890    17.89
  327.   505PTYP0145   4" Bend 1/4 Reg NH                 1    .750     .75    1.1    4.622     4.62
  328.   505PTYP0395   3"x2" Comb. Dbl Y & 1/8 NH         1    .920     .92    1.4    8.849     8.84
  329.   505PTYP0570   3" Coupling NH                     1                           1.762     1.76
  330.                                                               ------  -----  -------  -------
  331.       Subtotal: CI No Hub P&F                                   5.92    9.1%            85.12
  332. ==============================================================================================
  333.   Account Code:  420 - Hangers, Supports & Sleeves  
  334.   
  335.   581PITG0570   4" Dia Ins Shld 12"x18ga          10    .230    2.41    3.7    1.853    19.46
  336.   581PITG1520   3" Hngr Clevis Blk                 1   1.110    1.11    1.7    1.130     1.13
  337.   581PITG1550   4" Hngr Clevis Blk                10   1.400   14.70   22.5    1.385    14.54
  338.   581PMIH0055   10-1/2-PL REG HEX NUT              3                            .057      .17
  339.   581PMIH0070   10-3/8-PL REG HEX NUT             32                            .031     1.00
  340.   581PMIH0250   11-1/2 ROUND FLAT WASHERS          3                            .043      .12
  341.   581PMIH0265   11-3/8 ROUND FLAT WASHERS         32                            .031     1.01
  342.   581PMIH1180   355-PL STEEL CONCRETE INSERT      11                            .660     7.59
  343.   581PMIH1475   50-1/2-PL ALL THRD ROD P/FT        3                            .400     1.20
  344.   581PMIH1500   50-3/8-PL ALL THRD ROD P/FT       32                            .252     8.13
  345.                                                               ------  -----          --------
  346.       Subtotal: Hangers, Supports & Sleeves                    18.22   27.9%            54.40
  347. ==============================================================================================
  348.   Account Code:  430 - Excavation & Backfill
  349.   
  350.   990PEXC0005A  Exc 2'x3' trench <=5" pipe        60    .200   12.00   18.4 
  351.                                                               ------  -----          --------
  352.       Subtotal: Excavation & Backfill                          12.00   18.4%
  353.  
  354. 
  355.                                  TRF International, Inc.
  356.   JOB:   15-ED       *  TAKE-OFF PARTS SUMMARIZED BY PRODUCT TYPE  *       02-01-91 11:18 Pg:1
  357.  
  358.   Test Job                 BID DATE                    MATERIAL   LABOR  MATERIAL LABOR  LABOR
  359.   Wilson Const             01-29-91                      TAX       TAX     M/U     M/U   RATE 
  360.                                                         6.000%    EXEMPT  1.20    1.20  $30.00
  361.  
  362.                1=DIFFICULTY FACTOR                       ------ LABOR -----  ---- MATERIAL----
  363.   PART NUMBER   D E S C R I P T I O N             COUNT  UNIT   HOURS % TTL  UNIT       EXTEND
  364. ==============================================================================================
  365.   Product Code: 413p - *PIPE CAST IRON SOIL B&S 
  366.  
  367.   413PTYP0119   4"x5' Pipe CI SH P/ft             60    .230  13.80   21.1     3.847   230.82
  368.                                                              ------  -----           --------
  369.       Subtotal: *PIPE CAST IRON SOIL B&S                      13.80   21.1%            230.82
  370. ==============================================================================================
  371.   Product Code: 415p - *PIPE CAST IRON SOIL NH  
  372.  
  373.   415PTYP0029   3"x10' Pipe CI NH P/ft            10    .150   1.50    2.3     2.267    22.67
  374.   415PTYP0039   4"x10' Pipe CI NH P/ft            10    .200   2.00    3.1     2.932    29.32
  375.                                                              ------  -----            -------
  376.       Subtotal: *PIPE CAST IRON SOIL NH                        3.50   5.4%              52.00
  377. ==============================================================================================
  378.   Product Code: 462p - *TUBING COPPER WATER  
  379.  
  380.   462PCER0144   3/4" Pipe Cop L Hard              75    .060   4.50    6.9      .807    60.54
  381.                                                              ------  -----            -------
  382.       Subtotal: *TUBING COPPER WATER                           4.50    6.9%             60.54
  383. ==============================================================================================
  384.   Product Code: 503p - *PIPE FITTINGS CAST IRON B&S                                   
  385.  
  386.   503PTYP0149   4" 1/4 Bend Hub                    3    .830   2.49    3.8     7.306    21.92
  387.   503PTYP0210   4" 1/4 Bend Long Swp Hub           1    .890    .89    1.4    11.256    11.25
  388.   503PTYP0415   4"x4" Y & 1/8 Bnd Hub              1   1.580   1.58    2.4    13.743    13.74
  389.   503PTYP0445   6"x4" Y & 1/8 Bnd Hub              1   2.000   2.00    3.1    22.629    22.62
  390.                                                              ------  -----            -------
  391.       Subtotal: *PIPE FITTINGS CAST IRON B&S                   6.96   10.7%             69.54
  392. ==============================================================================================
  393.   Product Code: 505p - *PIPE FITTINGS NO HUB  
  394.  
  395.   505PTYP0020   4x4x10x16" Closet Bend PE NH       1    .750    .75    1.1    17.890    17.89
  396.   505PTYP0145   4" Bend 1/4 Reg NH                 1    .750    .75    1.1     4.622     4.62
  397.   505PTYP0395   3"x2" Comb. Dbl Y & 1/8 NH         1    .920    .92    1.4     8.849     8.84
  398.   505PTYP0570   3" Coupling NH                     1                           1.762     1.76
  399.                                                              ------  -----           --------
  400.       Subtotal: *PIPE FITTINGS NO HUB                          2.42    3.7%             33.12
  401. ==============================================================================================
  402.   Product Code: 543p - *TUBE FITTINGS COP PRESS CAST                                 
  403.  
  404.   543PNIB0070   3/4" Copper Union CxC              1    .540    .54     .8     1.749     1.74
  405.                                                              ------  -----             ------
  406.       Subtotal: *TUBE FITTINGS COP PRESS CAST                   .54     .8%              1.74
  407. ==============================================================================================
  408.   Product Code: 544p - *TUBE FITTINGS COP PRESS WROT  
  409.  
  410.   544PNIB0785   3/4" Cop 90 Ell CxC                4    .540   2.16    3.3      .413     1.65
  411.   544PNIB0885   3/4" Tee CxCxC                     1    .770    .77    1.2      .769      .76
  412.   544PNIB1705   1/2x6" Air Chamber                 1    .410    .41     .6     1.208     1.20
  413.                                                              ------  -----           --------
  414.       Subtotal: *TUBE FITTINGS COP PRESS WROT                  3.34    5.1%              3.63
  415. ==============================================================================================
  416. 
  417.                               TRF International, Inc. 
  418.   JOB:   15-ED       *  TAKE-OFF PARTS SUMMARIZED BY PRODUCT TYPE  *      02-01-91 11:18 Pg: 2 
  419.  
  420.   Test Job                 BID DATE                  MATERIAL   LABOR   MATERIAL  LABOR  LABOR
  421.   Wilson Const             01-29-91                    TAX       TAX      M/U      M/U    RATE
  422.                                                      6.000%    EXEMPT    1.20     1.20  $30.00 
  423.  
  424.      1=DIFFICULTY FACTOR                                 ---- LABOR ----      --- MATERIAL ---
  425.   PART NUMBER   D E S C R I P T I O N          COUNT    UNIT  HOURS  % TTL    UNIT      EXTEND
  426. ==============================================================================================
  427.   Product Code: 581p - *PIPE HANGERS 
  428.  
  429.   581PITG0570   4" Dia Ins Shld 12"x18ga          10    .230   2.41    3.7    1.853     19.46
  430.   581PITG1520   3" Hngr Clevis Blk                 1   1.110   1.11    1.7    1.130      1.13
  431.   581PITG1550   4" Hngr Clevis Blk                10   1.400  14.70   22.5    1.385     14.54
  432.   581PMIH0055   10-1/2-PL REG HEX NUT              3                           .057       .17
  433.   581PMIH0070   10-3/8-PL REG HEX NUT             32                           .031      1.00
  434.   581PMIH0250   11-1/2 ROUND FLAT WASHERS          3                           .043       .12
  435.   581PMIH0265   11-3/8 ROUND FLAT WASHERS         32                           .031      1.01
  436.   581PMIH1180   355-PL STEEL CONCRETE INSERT      11                           .660      7.59
  437.   581PMIH1475   50-1/2-PL ALL THRD ROD P/FT        3                           .400      1.20
  438.   581PMIH1500   50-3/8-PL ALL THRD ROD P/FT       32                           .252      8.13
  439.                                                              ------  -----           --------
  440.       Subtotal: *PIPE HANGERS                                 18.22   27.9%             54.40
  441. ==============================================================================================
  442.   Product Code: 990p - *Excavation & Backfill  
  443.  
  444.   990PEXC0005A  Exc 2'x3' trench <=5" pipe        60    .200  12.00   18.4
  445.                                                              ------  -----           --------
  446.      Subtotal: *Excavation & Backfill                         12.00   18.4%
  447. ==============================================================================================
  448.     Bid Totals:                                               65.28                     505.84
  449.  
  450. 
  451.                                       TRF International, Inc.
  452.   JOB:   15-ED          *  A B B R E V I A T E D   B I D   R E C A P  *   02-01-91 11:18 Pg: 2
  453.  
  454.   Test Job                 BID DATE                  MATERIAL   LABOR  MATERIAL  LABOR  LABOR
  455.   Wilson Const             01-29-91                    TAX      TAX      M/U     M/U    RATE 
  456.                                                      6.000%    EXEMPT   1.20     1.20   $30.00
  457. ==============================================================================================
  458.    MAN HOURS:      65.29     LABOR COST:      1,959 
  459.                            LABOR MARGIN:        392 
  460.  
  461.   * * *Q U O T E   M A T E R I A L S* * * 
  462.   ACT     COST      TAX   M/UP    PRICE 
  463.   M100 Fixtures 
  464.         8,200.00  492.00  1.15   9,995.80 
  465.   M103 Water Heaters 
  466.           680.00   40.80  1.20     864.96 
  467.  
  468.                           MATERIAL COST:      9,919 
  469.                         MATERIAL MARGIN:      1,549 
  470.  
  471.                             LABOR + MATERIAL COST:    11,878
  472.                           LABOR + MATERIAL MARGIN:     1,941
  473.  
  474.                                CONSTRUCTION PRICE:    13,819 
  475.     
  476.    * * * *    J O B   E X P E N S E S    * * * * 
  477.    ACT    COST      TAX   M/UP    PRICE 
  478.    E  1 SUPERVISION 
  479.           250.00          1.40     350.00 
  480.    E  7 Permits 
  481.           100.00          1.00     100.00 
  482.    E 13 Small Tools 
  483.           235.00          1.00     235.00 
  484.     
  485.                           JOB EXPENSE NET COST:        585 
  486.                             JOB EXPENSE MARGIN:        100 
  487.  
  488.                                TOTAL BID PRICE:     14,504 
  489.  
  490. 
  491.                               TRF International, Inc.
  492.                   * *   SYSTEM / SQUARE FOOTAGE BREAKDOWN   * *
  493.                                02-01-91 11:18 Pg: 1
  494.  
  495.   BID NAME: Test Job                          SQUARE FOOTAGE          : 3,500
  496.   BID NUMBER: 15                              SALES TAXES             : MAT=6.000% LAB=EXEMPT
  497.   BID DATE: 01-29-91                          TAKE-OFF MATERIAL MARKUP: 20%
  498.   ESTIMATOR: ED                               HOURLY LABOR RATE       : $30.00
  499.   JOB ADDRESS:                                LABOR MARKUP            : 20%
  500.   CUSTOMER: Wilson Cost                       LABOR DIFFICULTY        : LEVEL 1
  501.  
  502.                                       COSTS     % OF    COST PER     LABOR   % OF     HOUR PER
  503.   SYSTEM    SYSTEM NAME               TAXED     TOTAL   SQ.  FT.     HOURS   TOTAL      SQ.FT.
  504. ==============================================================================================
  505.   **** BID TAKE-OFF ITEMS **** 
  506.   1 Underground Sanitary             300.37    59.38     .0858     32.76   50.2       .0094 
  507.   2 Above Ground Sanitary             88.42    17.48     .0253      7.03   10.8       .0020 
  508.   3 Domestic Cold Water              117.03    23.14     .0334     25.49   39.1       .0073 
  509.                                  ----------  -------   -------   -------  -----   --------- 
  510.  SUBTOTAL - BID TAKE-OFF ITEMS:      505.82   100.00     .1445     65.28  100.0       .0187 
  511.  
  512.   **** QUOTED MATERIALS **** 
  513.  
  514.     Fixtures                      8,692.00    2.4834 
  515.     Water Heaters                   720.80     .2059 
  516.                                  ----------  --------  --------- 
  517.   SUBTOTAL - QUOTED MATERIALS:    9,412.80    2.6894 
  518.  
  519.    *** EXPENSE ITEMS **** 
  520.  
  521.     SUPERVISION                     250.00     .0714 
  522.     Permits                         100.00     .0286 
  523.     Small Tools                     235.00     .0671 
  524.                                 ----------   -------  --------- 
  525.   SUBTOTAL - EXPENSE ITEMS:         585.00     .1671 
  526.  
  527.  
  528.  
  529.                GRAND TOTALS:      10,503.62   100.0     3.0010     65.28  100.0       .0187 
  530.                                  ==========  ========= ========  =======  =====    ======== 
  531. 
  532.  
  533.                                TRF International, Inc.
  534.   JOB:   15-ED        * * * B I D   R E C A P   S H E E T * * *           02-01-91 11:18 Pg: 1 
  535.  
  536.   Test Job                          BID DATE      MATERIAL  LABOR    MATERIAL  LABOR    LABOR 
  537.   Wilson Const                      01-29-91        TAX      TAX     M/U       M/U      RATE 
  538.                                                    6.000%   EXEMPT   1.20      1.20    $30.00 
  539. ============================================================================================== 
  540.                       --  L A B O R  -- 
  541.   LOCATION ALLOCATION                     HOURS      COST 
  542.    1 Underground Sanitary                32.76     982.80 
  543.    2 Above Ground Sanitary                7.03     210.90 
  544.    3 Domestic Cold Water                 25.49     764.85 
  545.                                       --------  --------- 
  546.  
  547.     
  548.     
  549.                                      --  L A B O R  --   --------  M A T E R I A L  -------- 
  550.   ACCOUNT ALLOCATION - MATERIALS     HOURS        COST    NET COST        TAX      GROSS  M/UP 
  551.   330 Copper Type L P&F               8.38      251.40       62.20       3.73      65.93  1.20 
  552.   352 CI Hub P&F                     20.76      622.80      283.38      17.00     300.38  1.20 
  553.   354 CI No Hub P&F                   5.92      177.60       80.31       4.82      85.13  1.20 
  554.   420 Hangers, Supports & Sleeves    18.22      546.75       51.32       3.08      54.40  1.20 
  555.   430 Excavation & Backfill          12.00      360.00                                       
  556.                                    -------    --------   ---------    -------   --------  ---- 
  557.        TOTAL MATERIAL:               65.28    1,958.55      477.21      28.63     505.84  1.20 
  558.  
  559.     
  560.   ACCOUNT ALLOCATION - QUOTED ITEMS                       NET COST        TAX      GROSS  M/UP
  561.   100 Fixtures                                            8,200.00     492.00   8,692.00  1.15
  562.   103 Water Heaters                                         680.00      40.80     720.80  1.20
  563.                                                          ---------     -------  --------  ----
  564.          TOTAL QUOTED:                                    8,880.00     532.80   9,412.80  1.15 
  565.  
  566.  
  567.                             -------  E X P E N S E S ------- 
  568.   JOB EXPENSE ALLOCATION                                 NET COST         TAX       COST  M/UP 
  569.    1 SUPERVISION                                           250.00                 250.00  1.40
  570.    7 Permits                                               100.00                 100.00  1.00 
  571.   13 Small Tools                                           235.00                 235.00  1.00 
  572.                                                         ---------       ------   -------  ---- 
  573.           TOTAL JOB EXPENSE:                               585.00                 585.00  1.17 
  574.  
  575.  
  576.              TOTAL JOB COST:                            11,900.76      561.43  12,462.19     
  577.                TOTAL MARGIN:                                                    2,040.84  1.16 
  578.                                                                                ---------  ==== 
  579.         TOTAL SELLING PRICE:                                                   14,503.03 
  580.  
  581.                                                                               ========== 
  582. 
  583.                                  TRF International, Inc. 
  584.                     *   B I D   S U M M A R Y   A N A L Y S I S   * 
  585.                                   02-01-91 11:18 Pg: 1 
  586.  
  587.   BID NAME   : Test Job                        SQUARE FOOTAGE          : 3,500
  588.   BID NUMBER : 15                              SALES TAXES             : MAT=6.000% LAB=EXEMPT
  589.   BID DATE   : 01-29-91                        TAKE-OFF MATERIAL MARKUP: 20%
  590.   ESTIMATOR  : ED                              HOURLY LABOR RATE       :$30.00 
  591.   JOB ADDRESS:                                 LABOR MARKUP            : 20%
  592.   CUSTOMER   : Wilson Const                    LABOR DIFFICULTY        : LEVEL 1 
  593.  
  594.  
  595.                 COST W/O           SALES           SELLING     % OF    COST PER      SELL PER 
  596.                 SALES TAX      TAX     MARGIN        PRICE      SELL     SQ. FT.      SQ. FT. 
  597. ==============================================================================================
  598.   LABOR          1,958.55       .00     391.71      2,350.26    16.2      .56            .67
  599.   MATERIAL         477.20     28.63     101.17        607.00     4.2      .14            .17
  600.   QUOTED         8,880.00    532.80   1,447.96     10,860.76    74.9     2.69           3.10
  601.   EXPENSE          585.00       .00     100.00        685.00     4.7      .17            .20
  602.                ---------- ---------  ---------    -----------   ----  ---------      --------
  603.   TOTALS        11,900.75    561.43   2,040.84     14,503.02             3.56           4.14  
  604.   ********************************************************************************************
  605.  
  606.  
  607.                     * * *   MATERIAL TO LABOR RATIOS   * * *
  608.  
  609.  
  610.   (A) TOTAL LABOR HOURS:       65.29       (C)  TAKE-OFF MATERIAL COST:       505.83
  611.   (B)  TOTAL LABOR COST:    1,958.55       (D)    QUOTED MATERIAL COST:     9,412.80
  612.                                            (E)     TOTAL MATERIAL COST:     9,918.63
  613.  
  614.  
  615.  
  616.                      MATERIAL    -    LABOR      RATIO (M to L)
  617.  
  618.   TAKE-OFF MATERIAL COST (C) TO LABOR COST (B):    20.53%     -   79.47%        .26 to 1
  619.   QUOTED MATERIAL COST (D) TO LABOR COST (B)  :    82.78%     -   17.22%       4.81 to 1
  620.  
  621.   TOTAL MATERIAL COST (E) TO LABOR COST (B)   :    83.51%     -   16.49%       5.06 to 1
  622.  
  623. 
  624.   02-03-91 00:39                        TRF International, Inc.                   PAGE   1
  625.                              15-ED    Wilson Const   Adnd #3 Test Job
  626.                * * *   V E N D O R   Q U O T E   W O R K S H E E T   * * *
  627.       DCI NUMBER   D E S C R I P T I O N           QUANTITY   UNIT COST    EXTENDED
  628.    1  67061050007  4"x5' Pipe CI SH P/ft                 60     _______    ________
  629.              *PIPE CAST IRON SOIL B&S [413P] TOTAL:  _______
  630.  
  631.    2  67061000159  3"x10' Pipe CI NH P/ft                10     _______     _______
  632.    3  67061000161  4"x10' Pipe CI NH P/ft                10     _______     _______
  633.              *PIPE CAST IRON SOIL NH [415P] TOTAL:  _______
  634.  
  635.    4  64020140164  3/4" Pipe Cop L Hard                  75     _______     _______
  636.                 *TUBING COPPER WATER [462P] TOTAL:  _______
  637.  
  638.    5  67061050102  4" 1/4 Bend Hub                        3     _______     _______
  639.    6  67061050382  4" 1/4 Bend Long Swp Hub               1     _______     _______
  640.    7  67061050806  4"x4" Y & 1/8 Bnd Hub                  1     _______     _______
  641.    8  67061050813  6"x4" Y & 1/8 Bnd Hub                  1     _______     _______
  642.         *PIPE FITTINGS CAST IRON B&S [503P] TOTAL:  _______
  643.  
  644.    9  67061020580  4x4x10x16" Closet Bend PE NH           1     _______     _______
  645.   10  67061000194  4" Bend 1/4 Reg NH                     1     _______     _______
  646.   11  67061001804  3"x2" Comb. Dbl Y & 1/8 NH             1     _______     _______
  647.   12  67061000008  3" Coupling NH                         1     _______     _______
  648.                *PIPE FITTINGS NO HUB [505P] TOTAL:  _______
  649.  
  650.   13  03992373798  3/4" Copper Union CxC                  1     _______     _______
  651.        *TUBE FITTINGS COP PRESS CAST [543P] TOTAL:  _______
  652.  
  653.   14  03992372085  3/4" Cop 90 Ell CxC                    4     _______     _______
  654.   15  03992372635  3/4" Tee CxCxC                         1     _______     _______
  655.   16  03992373758  1/2x6" Air Chamber                     1     _______     _______
  656.        *TUBE FITTINGS COP PRESS WROT [544P] TOTAL:  _______
  657.  
  658.   17  69029119208  4" Dia Ins Shld 12"x18ga              11     _______     _______
  659.   18  69029121028  3" Hngr Clevis Blk                     1     _______     _______
  660.   19  69029121036  4" Hngr Clevis Blk                    11     _______     _______
  661.   20  67055510066  10-1/2-PL REG HEX NUT                  3     _______     _______
  662.   21  67055510064  10-3/8-PL REG HEX NUT                 32     _______     _______
  663.   22  67055510120  11-1/2 ROUND FLAT WASHERS              3     _______     _______
  664.   23  67055510110  11-3/8 ROUND FLAT WASHERS             32     _______     _______
  665.   24  67055526500  355-PL STEEL CONCRETE INSERT          12     _______     _______
  666.   25  67055520864  50-1/2-PL ALL THRD ROD P/FT            3     _______     _______
  667.   26  67055520862  50-3/8-PL ALL THRD ROD P/FT           32     _______     _______
  668.                *PIPE HANGERS [581P] TOTAL:          _______
  669.  
  670.                GRAND TOTAL:                         ======= 
  671. 
  672.  
  673.   02-05-91 15:11                   TRF International, Inc.             PAGE  1
  674.                         15-ED    Wilson Const   Adnd #3 Test Job
  675.  
  676.               * * C O N S O L I D A T E D   M A T E R I A L   L I S T * *
  677.  
  678.       PART NUMBER  D E S C R I P T I O N           QUANTITY   FROM STOCK    ORDERED
  679.    1  413PTYP0119  4"x5' Pipe CI SH P/ft                 60     _______     _______
  680.           *PIPE CAST IRON SOIL B&S [413P]:
  681.  
  682.    2  415PTYP0029  3"x10' Pipe CI NH P/ft                10     _______     _______
  683.    3  415PTYP0039  4"x10' Pipe CI NH P/ft                10     _______     _______
  684.            *PIPE CAST IRON SOIL NH [415P]:
  685.  
  686.    4  462PCER0144  3/4" Pipe Cop L Hard                  75     _______     _______
  687.               *TUBING COPPER WATER [462P]:
  688.  
  689.    5  503PTYP0149  4" 1/4 Bend Hub                        3     _______     _______
  690.    6  503PTYP0210  4" 1/4 Bend Long Swp Hub               1     _______     _______
  691.    7  503PTYP0415  4"x4" Y & 1/8 Bnd Hub                  1     _______     _______
  692.    8  503PTYP0445  6"x4" Y & 1/8 Bnd Hub                  1     _______     _______
  693.       *PIPE FITTINGS CAST IRON B&S [503P]:
  694.  
  695.    9  505PTYP0020  4x4x10x16" Closet Bend PE NH           1     _______     _______
  696.   10  505PTYP0145  4" Bend 1/4 Reg NH                     1     _______     _______
  697.   11  505PTYP0395  3"x2" Comb. Dbl Y & 1/8 NH             1     _______     _______
  698.   12  505PTYP0570  3" Coupling NH                         1     _______     _______
  699.              *PIPE FITTINGS NO HUB [505P]:
  700.  
  701.   13  543PNIB0070  3/4" Copper Union CxC                  1     _______     _______
  702.      *TUBE FITTINGS COP PRESS CAST [543P]:
  703.  
  704.   14  544PNIB0785  3/4" Cop 90 Ell CxC                    4     _______     _______
  705.   15  544PNIB0885  3/4" Tee CxCxC                         1     _______     _______
  706.   16  544PNIB1705  1/2x6" Air Chamber                     1     _______     _______
  707.      *TUBE FITTINGS COP PRESS WROT [544P]:
  708.  
  709.   17  581PITG0570  4" Dia Ins Shld 12"x18ga              11     _______     _______
  710.   18  581PITG1520  3" Hngr Clevis Blk                     1     _______     _______
  711.   19  581PITG1550  4" Hngr Clevis Blk                    11     _______     _______
  712.   20  581PMIH0055  10-1/2-PL REG HEX NUT                  3     _______     _______
  713.   21  581PMIH0070  10-3/8-PL REG HEX NUT                 32     _______     _______
  714.   22  581PMIH0250  11-1/2 ROUND FLAT WASHERS              3     _______     _______
  715.   23  581PMIH0265  11-3/8 ROUND FLAT WASHERS             32     _______     _______
  716.   24  581PMIH1180  355-PL STEEL CONCRETE INSERT          12     _______     _______
  717.   25  581PMIH1475  50-1/2-PL ALL THRD ROD P/FT            3     _______     _______
  718.   26  581PMIH1500  50-3/8-PL ALL THRD ROD P/FT           32     _______     _______
  719.                      *PIPE HANGERS [581P]:
  720.   27  990PEXC0005A Exc 2'x3' trench <=5" pipe            60     _______     ______
  721.             *EXCAVATION & BACKFILL [990P]:
  722.  
  723.             PULL DATE: ________      PULLED BY: ________   CHECKED BY: ________
  724.  
  725. 
  726.  
  727.   02-01-91 11:19            TRF International, Inc.                       PAGE     1     
  728.  
  729.                    15-ED    Wilson Const   Adnd #3 Test Job
  730.          * * C O N S O L I D A T E D    M A T E R I A L   L I S T * *
  731.  
  732.       PART NUMBER  D E S C R I P T I O N           QUANTITY   UNIT BID   REMARKS
  733.    1  413PTYP0119  4"x5' Pipe CI SH P/ft                 60    3.629  __________
  734.           *PIPE CAST IRON SOIL B&S [413P]:
  735.  
  736.    2  415PTYP0029  3"x10' Pipe CI NH P/ft                10    2.139  __________
  737.    3  415PTYP0039  4"x10' Pipe CI NH P/ft                10    2.766  __________
  738.            *PIPE CAST IRON SOIL NH [415P]:
  739.  
  740.    4  462PCER0144  3/4" Pipe Cop L Hard                  75     .761   __________
  741.               *TUBING COPPER WATER [462P]:
  742.  
  743.    5  503PTYP0149  4" 1/4 Bend Hub                        3    6.893   __________
  744.    6  503PTYP0210  4" 1/4 Bend Long Swp Hub               1   10.619   __________
  745.    7  503PTYP0415  4"x4" Y & 1/8 Bnd Hub                  1   12.965   __________
  746.    8  503PTYP0445  6"x4" Y & 1/8 Bnd Hub                  1   21.348   __________
  747.       *PIPE FITTINGS CAST IRON B&S [503P]:
  748.  
  749.    9  505PTYP0020  4x4x10x16" Closet Bend PE NH           1   16.877   __________
  750.   10  505PTYP0145  4" Bend 1/4 Reg NH                     1    4.360   __________
  751.   11  505PTYP0395  3"x2" Comb. Dbl Y & 1/8 NH             1    8.349   __________
  752.   12  505PTYP0570  3" Coupling NH                         1    1.662   __________
  753.              *PIPE FITTINGS NO HUB [505P]:
  754.  
  755.   13  543PNIB0070  3/4" Copper Union CxC                  1    1.650   __________
  756.      *TUBE FITTINGS COP PRESS CAST [543P]:
  757.  
  758.   14  544PNIB0785  3/4" Cop 90 Ell CxC                    4     .390   __________
  759.   15  544PNIB0885  3/4" Tee CxCxC                         1     .726   __________
  760.   16  544PNIB1705  1/2x6" Air Chamber                     1    1.140   __________
  761.      *TUBE FITTINGS COP PRESS WROT [544P]:
  762.  
  763.   17  581PITG0570  4" Dia Ins Shld 12"x18ga              11    1.749   __________
  764.   18  581PITG1520  3" Hngr Clevis Blk                     1    1.066   __________
  765.   19  581PITG1550  4" Hngr Clevis Blk                    11    1.307   __________
  766.   20  581PMIH0055  10-1/2-PL REG HEX NUT                  3     .054   __________
  767.   21  581PMIH0070  10-3/8-PL REG HEX NUT                 32     .029   __________
  768.   22  581PMIH0250  11-1/2 ROUND FLAT WASHERS              3     .040   __________
  769.   23  581PMIH0265  11-3/8 ROUND FLAT WASHERS             32     .029   __________
  770.   24  581PMIH1180  355-PL STEEL CONCRETE INSERT          12     .623   __________
  771.   25  581PMIH1475  50-1/2-PL ALL THRD ROD P/FT            3     .378   __________
  772.   26  581PMIH1500  50-3/8-PL ALL THRD ROD P/FT           32     .238   __________
  773.                      *PIPE HANGERS [581P]:
  774.  
  775.   27  990PEXC0005A Exc 2'x3' trench <=5" pipe            60   ______   __________
  776.             *Excavation & Backfill [990P]:
  777.  
  778.                              * * * END OF LIST * * *
  779. 
  780.  
  781.                             TRF International, Inc.
  782.   Date 02-06-91             S P E C I F I C A T I O N             15-ED        Pg 1
  783.   Wilson Const            Test Job                                          Adnd #3
  784.   QUANTITY   DESCRIPTION                                     EACH        EXTENDED
  785.  
  786.                Underground Sanitary
  787.         60     4"X5' PIPE CI SH P/FT                       12.896          773.80
  788.          3     4" 1/4 Bend Hub                             38.646          115.94
  789.          1     4" 1/4 Bend Long Swp Hub                    45.550           45.55
  790.          1     6"x4" Y & 1/8 Bnd Hub                       99.160           99.16
  791.          1     4"x4" Y & 1/8 Bnd Hub                       73.370           73.37
  792.         60     Exc 2'x3' trench <=5" pipe                   7.200          432.00
  793.  
  794.                Above Ground Sanitary
  795.         10     4"X10' PIPE CI NH P/FT                      10.719          107.19
  796.          1     4" Bend 1/4 Reg NH                          32.550           32.55
  797.          1     4x4x10x16" Closet Bend PE NH                48.470           48.47
  798.         10     3" CI NH 10ft w/HNGR                        12.724          127.24
  799.          1     3"x2" Comb. Dbl Y & 1/8 NH                  43.740           43.74
  800.  
  801.                Domestic Cold Water
  802.         75     3/4" Cop L w/Hngr & Shld                    12.161          912.12
  803.          4     3/4" Cop 90 Ell CxC                         19.935           79.74
  804.          1     3/4" Tee CxCxC                              28.640           28.64
  805.          1     1/2x6" Air Chamber                          16.210           16.21
  806.          1     3/4" Copper Union CxC                       21.540           21.54
  807.  
  808.                SUPERVISION                                                 350.00
  809.                Permits                                                     100.00
  810.                Small Tools                                                 235.00
  811.                Fixtures                                                  9,995.80
  812.                Water Heaters                                               864.96
  813.  
  814.                                              TOTAL BID PRICE:          $14,503.02
  815.  
  816.                                                                        ==========
  817.  
  818.  
  819. 
  820.  
  821.  
  822.   February 3, 1991
  823.   Wilson Construction, Inc.
  824.   924 West Ave.
  825.   Miami Beach, Florida, 33004
  826.  
  827.  
  828.   Attn: Mr. Jim Wilson
  829.  
  830.   Ref : Test Job
  831.  
  832.  
  833.   Dear Mr. Wilson;
  834.  
  835.   We are pleased to provide you the following proposal for the work described
  836.   on the Plans & Specifications Dated Jan 3, 1991. 
  837.  
  838.   Our quotation includes all amendments through Number 4 and includes the 
  839.   following Scope of Work.
  840.  
  841.        QTY   DESCRIPTION OF WORK
  842.  
  843.              Underground Sanitary
  844.         60   4"X5' PIPE CI SH P/FT
  845.          3   4" 1/4 Bend Hub
  846.          1   4" 1/4 Bend Long Swp Hub
  847.          1   6"x4" Y & 1/8 Bnd Hub
  848.          1   4"x4" Y & 1/8 Bnd Hub
  849.         60   Exc 2'x3' trench <=5" pipe
  850.  
  851.              Above Ground Sanitary
  852.  
  853.         10   4"X10' PIPE CI NH P/FT
  854.          1   4" Bend 1/4 Reg NH
  855.          1   4x4x10x16" Closet Bend PE NH
  856.         10   3" CI NH 10ft w/HNGR
  857.          1   3"x2" Comb. Dbl Y & 1/8 NH
  858.  
  859.              Domestic Cold Water
  860.              
  861.         75   3/4" Cop L w/Hngr & Shld
  862.          4   3/4" Cop 90 Ell CxC
  863.          1   3/4" Tee CxCxC
  864.          1   1/2x6" Air Chamber
  865.          1   3/4" Copper Union CxC
  866.  
  867.              SUPERVISION
  868.              Permits
  869.              Small Tools
  870.              Fixtures
  871.              Water Heaters
  872.                             TOTAL BID PRICE:        $ 14,503.02
  873.                                                      ==========
  874.  
  875.  
  876.  
  877.  
  878.  
  879.  
  880.  
  881.  
  882.  
  883.  
  884.  
  885.  
  886.  
  887.  
  888.  
  889.  
  890.  
  891.  
  892.  
  893.  
  894.  
  895.  
  896.  
  897.  
  898.  
  899.  
  900.  
  901.  
  902.  
  903.  
  904.  
  905.  
  906.  
  907.  
  908.  
  909.  
  910.  
  911.  
  912.  
  913.  
  914.  
  915.  
  916.  
  917.  
  918.  
  919.  
  920.  
  921.  
  922.  
  923.  
  924.  
  925.  
  926.  
  927.  
  928.  
  929.  
  930.  
  931.  
  932.  
  933.  
  934.  
  935.  
  936.  
  937.  
  938.  
  939.  
  940.  
  941.  
  942.  
  943.  
  944.  
  945.  
  946.  
  947.  
  948.  
  949.  
  950.  
  951.  
  952.  
  953.  
  954.  
  955.  
  956.  
  957.  
  958.  
  959.  
  960.  
  961.  
  962.  
  963.  
  964.  
  965.  
  966.  
  967.  
  968.  
  969.  
  970.  
  971.  
  972.  
  973.  
  974.  
  975.  
  976.  
  977.  
  978.  
  979.  
  980.  
  981.  
  982.  
  983.  
  984.  
  985.  
  986.  
  987.  
  988.  
  989.  
  990.  
  991.  
  992.  
  993.  
  994.  
  995.  
  996.  
  997.  
  998.  
  999.  
  1000.  
  1001.  
  1002.  
  1003.  
  1004.  
  1005.  
  1006.  
  1007.  
  1008.  
  1009.  
  1010.  
  1011.  
  1012.  
  1013.  
  1014.